[1]
2025. Minimising the Cycle Time with Assembly Line Balancing and Worker Assignment: A Case Study in a Medical Device Manufacturer Company. The Eurasia Proceedings of Science, Technology, Engineering and Mathematics. 35, (Sep. 2025), 133–139. DOI:https://doi.org/10.55549/epstem.1804397.