“Minimising the Cycle Time With Assembly Line Balancing and Worker Assignment: A Case Study in a Medical Device Manufacturer Company”. 2025. The Eurasia Proceedings of Science, Technology, Engineering and Mathematics 35 (September): 133-39. https://doi.org/10.55549/epstem.1804397.