“Minimising the Cycle Time With Assembly Line Balancing and Worker Assignment: A Case Study in a Medical Device Manufacturer Company”. The Eurasia Proceedings of Science, Technology, Engineering and Mathematics, vol. 35, Sept. 2025, pp. 133-9, https://doi.org/10.55549/epstem.1804397.