“Minimising the Cycle Time With Assembly Line Balancing and Worker Assignment: A Case Study in a Medical Device Manufacturer Company”. The Eurasia Proceedings of Science, Technology, Engineering and Mathematics 35 (September 30, 2025): 133–139. Accessed February 8, 2026. https://epstem.net/index.php/epstem/article/view/1125.